A lot of wind so far this week. All with a touch of “north” in it, so it’s turned cold. Occasional very heavy rain down pours.

Despite that, the ecofab team are making good progress┬áchecking all the Glulam frame bits of wood, one by one, before they start. Otherwise a section being wrong, when the frame is half up, could apparently be a complete screw up! So far all the checks have been fine. There have been a couple of bits that they’ve had to make some very minor tweaks to, but so far nothing has had to go back to the manufacturer.

2013-11-19 08.59.03 (2)

 

While that has been going on, the rest of the site team have finished the top slab pour (see above and below):

2013-11-19 16.14.40 (2)

 

This went into the site space that had the site cabin, which has now been replaced with a smaller one:

2013-11-19 16.13.53 (2)

 

The team have started on the groundworks for the eastern boundary wall and eastern garage wall footing:

2013-11-19 16.21.20 (2)