Glulam checks & other bits

A lot of wind so far this week. All with a touch of “north” in it, so it’s turned cold. Occasional very heavy rain down pours.

Despite that, the ecofab team are making good progress checking all the Glulam frame bits of wood, one by one, before they start. Otherwise a section being wrong, when the frame is half up, could apparently be a complete screw up! So far all the checks have been fine. There have been a couple of bits that they’ve had to make some very minor tweaks to, but so far nothing has had to go back to the manufacturer.

2013-11-19 08.59.03 (2)

 

While that has been going on, the rest of the site team have finished the top slab pour (see above and below):

2013-11-19 16.14.40 (2)

 

This went into the site space that had the site cabin, which has now been replaced with a smaller one:

2013-11-19 16.13.53 (2)

 

The team have started on the groundworks for the eastern boundary wall and eastern garage wall footing:

2013-11-19 16.21.20 (2)