The under ground foot to the wall between Silver Spray and Ramoth is longer than hoped. So Graham and Sam are doing to jack hammer break it up, in order to take the wall down.
The wall just past the courtyard wall, southwards, has had footing and column of blocks put under it. The edge of the courtyard retaining wall has also been cut into, so that when it’s pulled down, the Ramoth rear section is left OK.
Footing:
Supporting block work column:
Silver Spray dug out trench to help the wall come down:
Ramoth side courtyard tiles come up to get down to the footing for the retaining wall:
By the end of Friday the wall was over, but still in one piece. A pecker bit for the digger will be on-site on Monday afternoon to break it up: