Silver Spray to Ramoth wall – Part 2

The under ground foot to the wall between Silver Spray and Ramoth is longer than hoped. So Graham and Sam are doing to jack hammer break it up, in order to take the wall down.

The wall just past the courtyard wall, southwards, has had footing and column of blocks put under it. The edge of the courtyard retaining wall has also been cut into, so that when it’s pulled down, the Ramoth rear section is left OK.

Footing:

2013-10-09-15.05.02_600w

 

Supporting block work column:

 

2013-10-11-08.54.47_600w

Silver Spray dug out trench to help the wall come down:

2013-10-11-08.53.07_600w

 

Ramoth side courtyard tiles come up to get down to the footing for the retaining wall:

2013-10-11-08.49.39_600w

By the end of Friday the wall was over, but still in one piece. A pecker bit for the digger will be on-site on Monday afternoon to break it up:

2013-10-11-15.05.58_600w+cropped