Silver Spray to Ramoth wall

Nigel and Sam have started taking down the “rotting” dividing wall between Silver Spray and Ramoth. The agreed plan is to put in a small footing and a 2 to 3 block wall up for now. Once the Silver Spray building works are done, we can decided if we want this wall to go higher in any areas.

This has exposed that the Ramoth courtyard, which used to hold back the rear garden with a retaining wall has a bulging lump of concrete into the Silver Spray plot. The bulge looks to be about a foot into the plot, which would narrow the path down the side of the house too much to leave in place.

2013-10-09-12.22.26_600w

 

2013-10-09-12.22.26_crop

2013-10-09-12.02.34_600w

 

2013-10-09-12.02.41_600w

 

2013-10-09-12.21.53_600w