More cladding, the last door & the garage progress

A chunk more cladding has gone up, including some of the thinner horizontal cladding on the top box:

2014-03-22 14.35.17 (2)

The vertical cladding on the middle box is wider with nice detailing around the windows.

2014-03-19 09.06.15 (2) 2014-03-19 09.02.37 (2)

 

The last door has been put in. The doors and windows are all in place, but not yet 100% fitted.

2014-03-21 08.58.00 (2)

 

The garage floor has been poured and the last internal wall is going up:

2014-03-21 09.03.28 (2)

 

Amazing to be calm and dry, inside, with outside having howling wind (I’d been kitesurfing earlier in the day), looking out at kitesurfers on the beach.

2014-03-22 14.29.15 (2)