More groundworks progress

The footing to put back a wall between Silver Spray and next door is dug.

2013-10-16 16.46.12_600w

The drainage sheet for the upper section of retaining wall concrete pour is in place.

2013-10-16 16.47.41-2_600w

The over sized (to future proof) hot tub area slab hole is dug out and re-enforced. The boundary wall behind this has also been taken down to be replaced with a wall with a proper footing.

2013-10-16 16.46.36_600w