The footing to put back a wall between Silver Spray and next door is dug.
The drainage sheet for the upper section of retaining wall concrete pour is in place.
The over sized (to future proof) hot tub area slab hole is dug out and re-enforced. The boundary wall behind this has also been taken down to be replaced with a wall with a proper footing.