Retaining wall concrete, wall smashing, small wall foundation

A lot went on today.

The big pile of earth and rock that was in the garage area, was cleared away in the morning.

The retaining wall and it’s foundation footing has been broken up a chunk.

3 truck loads of concrete have been pumped from the trucks to behind the retaining wall shuttering for the main house.

Three cement trucks arrive:

2013-10-14 14.47.20 - tweaked _600w

 

The truck parked in the garage area, just in from the cement lorry, is pumping the cement up the black pipe to the chaps pouring it in, and then vibrating it, so that it all settles down with no air gaps etc.

2013-10-14 14.48.52_600w

 

2013-10-14 14.54.15_800w

2013-10-14 14.49.08_600w

2013-10-14 14.49.58_600w

Looking at the area, that at the time of the photo hadn’t had concrete poured in, you can see the spacers to keep the steel bars a set distance in from what will be the external edges of the concrete.

2013-10-14 14.50.50_600w

2013-10-14 15.03.59_600w

You can see the picker on the digger, that is breaking apart the re-enforced wall and it’s foundation footing.

2013-10-14 15.07.30 _600w

At the front, a small footing is being made to re-instate the Kiephuis garden:

2013-10-14 14.58.26_600w

2013-10-14 14.58.45_600w