The hole dug for the house was deeper than what will be internal and external finished floor level.
The garage roof also has a large chunk that will have topsoil and then grass.
Ahead of that, now that there’s a loo in the house, the site chemical loo has been taken away:
First a chunk of top soil went on the garage roof and other areas that are going to be slate paving were filled in:

In the courtyard, the ground source heat pump pipes needed to be connected up to their manifold:


Before more material fills up the site:
and a bit more to the front: