The roof is on

The building now has it’s form. Cladding and other external detail will, mostly, only change what it looks like.

2014-01-15 16.32.28-2

 

The “cherry picker” crane was able to reach onto the top of the first floor, from where the hand lifts could take panels up to the top of the 2nd floor.

2014-01-14 13.23.52 (3)

This collage has one of the last panels being lifted to the top of the 2nd floor and being put in:

2014-01-14 09 - top roof panel collage

 

Inside, the lack of internal walls can mean supervision from the 1st floor up to the 2nd floor which will be the study.

2014-01-15 09.38.36 - filter to P (2)

 

The view from the study:

2014-01-14 13.27.53-2

2014-01-16 11.49.51 (2)

The roof and other elements are being taped, sealed, filled in …..

2014-01-14 13.28.40 (2)

The bulk of the doors and windows arrive soon. They might not all go in straight away.